S.No |
Customer |
Boiler Vendor |
Consultant |
Scope of Supply |
Project |
Status of Project |
1. |
Al Arish Electric Generating Co. Limited, Cairo, Egypt |
BHEL, Trichy |
---------- |
Design, detailed Engineering, Supply of Siemens S7 400 R Redundant PLC based DACS |
2 * 30 MW Power Plant |
Commissioned during Nov. 2001 |
2 |
Nagarjuna Electric Generating Company Ltd., Andhra Pradesh |
Cethar Vessels Ltd. Trichy |
DCL, Calcutta |
Design, detailed Engineering, Supply of turnkey C & I Package with Siemens Redundant PLC based DACS |
20 MW Combined Cycle Power Plant
(12 MW Gas turbine)
1*38 TPH WHR Boiler |
Commissioned during
July 1999 |
3 |
Associated Power Team Ltd.,
Andhra Pradesh |
Cethar Vessels Ltd, Trichy |
DCL, Calcutta |
-do- |
20 MW Combined Cycle Power Plant
8 MW Steam Turbine |
Commissioned during July 1999 |
4 |
Hindustan Electro Graphites
Madhya Pradesh |
Cethar Vessels Ltd, Trichy |
IDEA, Chennai |
-do- |
15 MW Captive Power Plant
2 *12 TPH WHR Boiler, 1*30 TPH FBC Boiler |
Commissioned during January 1997 |
5 |
Gujarat Heavy Chemicals Ltd.,
Gujarat |
Existing Boiler retrofitted by Cethar Vessels Ltd |
Avant Garde, Chennai |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 2000 Redundant DACS |
11 Co generation Plant
1* 90 TPH FBC Boiler |
Commissioned during
August 1995 |
6 |
India Cements Limited.
Sugar Division, Karnataka |
Thermodyne Boiler, Chennai |
---------- |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 500 DACS |
12 MW Co generation Plant
2*40 TPH Boiler |
Commissioned during
November 1999 |
7 |
India Glycols Limited
Uttar Pradesh |
Cethar Vessels Ltd.
Trichy |
Toyo Engineering, Mumbai |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 500 DCS |
11 MW Co generation Plant
1* 20 TPH FBC Boiler |
Commissioned during December 1994 |
8 |
Singareni Colleries Limited
Kothagudam, Andhra Pradesh |
Cethar Vessels Ltd. Trichy |
---------- |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 500 DCS |
8 MW Co generation Plant
1*8 TPH FBC Boiler |
Commissioned during January 1993 |
9 |
Birla Jute & Industries Limited, West Bengal |
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
7 MW Co generation Plant
2*25 TPH FBC Boiler |
Commissioned during March 1994 |
10 |
Kesoram Rayon Limtied
West Bengal |
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
7 MW Co generation Plant
1*25 TPH FBC Boiler |
Commissioned during October 1997 |
11 |
Satna Cement Works Limited, Madhya Pradesh |
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
6 MW Co generation Plant
1* 20 TPH FBC Boiler |
Commissioned during June 1993 |
12 |
Sun Paper Mills Limited Tamil Nadu |
Cethar Vessels Ltd. Trichy |
Shramir Consultec
Chennai |
Design, detailed Engineering, Supply of turnkey C & I package with Siemens Loop Controllers & PLC based DACS |
6 MW Co generation Plant 1*40 TPH FBC Boiler |
Commissioned during January 1999 |
13 |
Andhra Pradesh Paper Mills Limited, Andhra Pradesh |
Cethar Vessels Ltd. Trichy |
---------- |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 2000 Redundant DCS |
6 MW Co generation Plant
2*35 TPH FBC Boiler |
Commissioned during August 1999 |
14 |
Coastal Paper Mills Limited Andhra Pradesh |
Cethar Vessels Ltd. Trichy |
---------- |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 500 DCS |
5.5 MW Co generation Plant
1*35 TPH FBC Boiler |
Commissioned during March 1996 |
15 |
Nath Pup & Paper Mills Limited, Maharastra |
Cethar Vessels Ltd. Trichy |
---------- |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 500 DCS |
5.4 MW Co generation Plant
1*30 TPH FBC Boiler |
Commissioned during December 1994 |
16 |
Aurangabad Paper Mills Limited, Maharastra |
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
5.4 MW Co generation Plant
1*30 TPH FBC Boiler |
Commissioned during April 1995 |
17 |
Singareni Colleries Limited
Ramagundam, Andhra Pradesh
|
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
5 MW Co generation Plant
1*35 TPH FBC Boiler |
Commissioned during August 1997 |
18 |
Grasim Industries Limited Kerala
|
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
5 MW Co generation Plant
2*17 TPH FBC Boilers
|
Commissioned during January 1996 |
19 |
Piccadily Agro Industries, Sugar Sugar Division, Haryana |
Ignifluid Boilers Ltd. Chennai |
---------- |
Design, detailed Engineering, Supply, E & C of turnkey C& I package with Siemens Loop Controllers
|
5 MW Co generation Plant
1*40 TPH Bagasse Fired Boiler
|
Commissioned during January 1996 |
20 |
Dwarikesh Sugar Industries Limited, Uttar Pradesh |
Ignifluid Boilers Ltd. Chennai |
---------- |
-do- |
5 MW Co generation Plant
1*40 TPH Bagasse Fired Boiler
|
Commissioned during January 1996 |
21 |
Ceylon Petroleum Corporation, Ceylon |
Cethar Vessels Ltd. Trichy |
---------- |
-do- |
4.5 MW Co generation Plant
1*15 TPH Oil fired Boiler |
Commissioned during April 1997 |
22 |
Mahalaksmi Sugars Limited Uttar Pradesh |
Thermodyne Boiler, Chennai |
---------- |
-do- |
3 MW Co generation Plant
1*40 TPH Bagasse Fired Boiler
|
Commissioned during April 1997 |
23 |
Sponge Iron Ore Limited
Andhra Pradesh |
Cethar Vessels Ltd. Trichy |
---------- |
Design, detailed Engineering, Supply of turnkey C & I package with MAXCON 500 DCS |
3 MW Co generation Plant
1*40 TPH FBC Boiler
|
Commissioned during August 1996 |
24 |
Hindustan Lever Limited
Tamil Nadu
|
Cethar Vessels Ltd. Trichy |
---------- |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Loop Controllers & Drive System. |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Loop Controllers & Drive System. |
Commissioned during December 1999 |
25 |
Nahar Sugars Limited, Punjab |
Thermodyne Boiler, Chennai |
---------- |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Bells make Loop Controllers |
1*40 TPH Bagasse Fired Boiler |
Running Since October 2001 |
26 |
Oswal Cotton Mills Limited, Punjab |
Thermodyne Boiler, Chennai |
---------- |
-do- |
1*40 TPH Bagasse Fired Boiler |
Running Since November 2001 |
27 |
Narendra Papers Limited, Punjab |
Thermodyne Boiler, Chennai |
|
-do- |
1*40 TPH Bagasse Fired Boiler |
Running Since December 2001 |
28 |
KMS Power Limited
Andhra Pradesh
|
Cethar Vessels Ltd. Trichy |
M N Dastur & Co. |
Design, Detailed Engineering, Supply of Siemens controllers |
1*40 TPH FBC Boiler |
Running since March 2002 |
29 |
Bihar Sponge Iron Limited Bihar
|
Cethar Vessels Ltd. Trichy |
|
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
4 MW Captive Power Plant |
Running since September 2002 |
30 |
Chitra Bio Energy Limited Tamil Nadu
|
Thermodyne Boiler, Chennai |
M N Dastur & Co. |
Design, Detailed Engineering, Supply, E & C of Field Instrumentation package |
4 MW Captive Power Plant
1* 60 TPH FBC Boiler
|
Running since September 2002 |
31 |
Aurobindo Pharma Limited
Andhra Pradesh |
Cethar Vessels Ltd. Trichy |
---- |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
1* 40 TPH FBC Boiler |
Running since
April 2003 |
32 |
Suchand Powergen Limited
Andhra Pradesh |
Thermodyne Boiler, Chennai |
Turbomachinery, Hyderabad |
Design, Detailed Engineering, Supply, E & C of turnkey C & I package with MAXCON 500 DCS |
1 * 60 TPH FBC Boiler |
Running since
February 2003 |
33 |
Madhya Bharat Paper Mills Limited, Chattisgarh |
Cethar Vessels Ltd. Trichy |
DCL, Calcutta |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Siemens S7 300 PLC based SCADA System |
6 MW Captive Power Plant
1 * 60 TPH FBC Boiler |
Running since
March 2003 |
34 |
Param Industries Limited Gujarat |
Cethar Vessels Ltd. Trichy |
|
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
1 * 40 TPH FBC Boiler |
Running since
November 2005 |
35 |
Hima Ispat Limited,
Orissa. |
Cethar Vessels Ltd. Trichy |
|
Design, detailed Engineering, Supply, E & C of Siemens S7 300 R Redundant PLC based SCADA System |
4 MW Captive Power Plant
1 * 60 TPH FBC Boiler |
Under execution |
36 |
Euro ceramics Pvt Limited,
Gujarat. |
Cethar Vessels Ltd. Trichy |
EICS - Chennai |
Design, detailed Engineering, Supply, E & C of Siemens S7 400 R Redundant PLC based SCADA System |
10 MW Captive Power Plant
1 * 45 TPH FBC Boiler |
Running Since
February 2006 |
37 |
MPS Power & Steel Limited,
Kerala |
Cethar Vessels Ltd. Trichy |
|
- do - |
10 MW Captive Power Plant
1 * 60 TPH FBC Boiler |
Under execution |
38 |
Maa Chinnamastikka Power Limited, West Bengal |
Cethar Vessels Ltd. Trichy |
EICS Chennai |
Design, detailed Engineering, Supply, E & C of Siemens PCS 7 Hot Redundant DCS |
12 MW Captive Power Plant
1 * 30 TPH FBC Boiler |
Under execution |
39 |
Sunshine Olechem Limited, Gujarat |
Cethar Vessels Ltd. Trichy |
|
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
1 * 40 TPH FBC Boiler |
Running since October 2006 |
40 |
Gulshan Polyols Limited
Gujarat |
Thermodyne Boiler, Chennai |
|
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
4 MW Captive Power Plant
60 TPH Stoker fired Boiler |
Running since
May 2006 |
41 |
Maa Chinnamastikka Power Limited, West Bengal |
Veesons Ltd. Trichy |
EICS Chennai |
Design, detailed Engineering, Supply, E & C of Field Instrumentation & integration to existing DCS |
12 MW Captive Power Plant
2*10 TPH WHR Boiler
1* 16 TPH WHR Boiler |
Under execution |
42 |
Rukmani Power & Steel
Chhattisgarh |
Thermodyne Boiler, Chennai |
Avant Garde Chennai |
Design, detailed Engineering, Supply, E & C of Field Instrumentation package |
12 MW Captive Power Plant
1*45 TPH FBC Boiler |
Commissioned during January 2007 |
43 |
Magadi Soda Ash Limited, Kenya |
Thermodyne Boiler, Chennai |
L & T, Chennai |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Siemens S7 300 R Redundant PLC based SCADA System |
1*45 TPH FBC Boiler |
Running since
April 2006 |
44 |
Deepak Steels Limited
Ranchi |
Thermodyne Boiler, Chennai |
CET, Ranchi |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
2*10 TPH WHR Boiler
2*5 TPH WHR Boiler |
Under execution |
45 |
ABC Limited,
Thailand |
Veesons Limited. Trichy |
Rite Choice, Chennai |
Design, detailed Engineering, Supply, E & C of HC 900 Honeywell DCS |
1*45 TPH Bark fired Boiler |
Commissioned during January 2007 |
46 |
Far East Alcohol Industries Pte Ltd., Thailand. |
Cogent Engineers. Pune |
|
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Siemens Loop Controllers |
1*42 TPH Travelling Grate Boiler |
Commissioned during December 2006 |
47 |
Renuka Sugars Limited,
Munoli, Karnataka |
Thermodyne Boiler, Chennai |
|
Design, Detailed Engineering, Supply of turnkey C & I package with Siemens Loop Controllers |
1 * 100 TPH Bagasse fired Boiler |
Commissioned during Febraury 2007 |
48 |
Renuka Sugars Limited, Athani, Karnataka |
Thermodyne Boiler, Chennai |
|
Design, detailed Engineering, Supply, E & C of turnkey C& I package with Siemens S7 300 PLC based SCADA System |
1 * 100 TPH Bagasse fired Boiler |
Commissioned during Febraury 2007 |
49 |
Mittal Steel
Annaba - Algeria |
|
Turbomachinery Engineering Industries Ltd |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Siemens S7 400 PLC based SCADA System |
2 X 26.5 MW Captive Power Plant |
Under Execution |
50 |
Tikuala Sugars Limited, |
Thermodyne Boiler, Chennai |
|
Design, detailed Engineering, Supply, E & C of turnkey C& I package with Siemens PCS 7 DCS |
1 * 75 TPH Bagasse fired Boiler |
Commissioned during Febraury 2007 |
51 |
Chilwaria Sugars -I, |
Thermodyne Boiler, Chennai |
|
Design, detailed Engineering, Supply, E & C of turnkey C& I package with Siemens PCS 7 DCS |
1 * 80 TPH Bagasse fired Boiler |
Commissioned during Febraury 2007 |
52 |
Chilwaria Sugars -II, |
Thermodyne Boiler, Chennai |
|
Design, detailed Engineering, Supply, E & C of turnkey C& I package with Siemens PCS 7 DCS |
1 * 80 TPH Bagasse fired Boiler |
Under Execution |
S.No |
Customer |
Consultant |
Scope of Supply |
Project |
Status of Project |
1. |
Tamil Nadu Newsprint &Papers Limited, Tamil Nadu |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
Wet Lap Machine Automation |
Running since
November 1998 |
2 |
Tamil Nadu Newsprint &Papers Limited, Tamil Nadu |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 300 R redundant PLC based SCADA System |
Reel Wrapping Machine Automation |
Running since
June 2003 |
3 |
Tamil Nadu Newsprint &Papers Limited, Tamil Nadu |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 200 PLC based SCADA System |
Energy Management System |
Running since
March 2002 |
4 |
Tamil Nadu Newsprint &Papers Limited, Tamil Nadu |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
132 KW Soft Starter Panel |
Running since
March 2002 |
5 |
Satia Paper Mills Limited, Muktsar, Punjab |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
Deinking Plant Automation |
Running since
January 2001 |
6 |
Ballarpur Industries Limited,
Sewa, Orissa |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
Burner Management System for Oil fired Boiler |
Running since April 1998 |
7 |
Seshasayee Paper Boards Ltd, Tamil Nadu |
SPB – PC |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
Reel Wrapping Machine Automation |
Running since February 1999 |
8 |
Seshasayee Paper Boards Ltd, Tamil Nadu |
SPB – PC |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
A4 Cutter Machine Automation |
Running since July 1999 |
9 |
Seshasayee Paper Boards Ltd, Tamil Nadu |
SPB – PC |
Design, Detailed Engineering, Supply of Siemens S7 200 PLC based System |
Compressor Automation |
Running since August 1999 |
10 |
Nath Pulp &Paper Mills Limited, |
---------- |
Design, Detailed Engineering, Supply of MAXCON 500 Distributed Control System |
FBC Boiler Automation |
Running since February 1995 |
11 |
Andhra Pradesh paper Mills Limited, Andhra Pradesh |
---------- |
Design, Detailed Engineering, Supply of MAXCON 500 Distributed Control System |
FBC Boiler Automation |
Running since September 1998 |
12 |
Aurangabad paper Mills Limited |
---------- |
Design, Detailed Engineering, Supply of MAXCON 500 Distributed Control System |
FBC Boiler Automation |
Running since April 1996 |
13 |
Madhya Bharat Paper Mills Limited, Chattisgarh |
DCL, Calcutta |
Design, detailed Engineering, Supply, E & C of turnkey C & I package with Siemens S7 300 PLC based SCADA System |
6 MW Captive Power Plant |
Running since
March 2003 |
14 |
Sun Paper Mills Limited Tamil Nadu |
Shramir Consultec
Chennai |
Design, detailed Engineering, Supply of turnkey C & I package with Siemens Loop Controllers & PLC based DACS |
6 MW Co generation Plant
1*40 TPH FBC Boiler |
Commissioned during January 1999 |
15 |
Coastal paper Mills Limited, Andhra Pradesh |
---------- |
Design, Detailed Engineering, Supply of MAXCON 500 Distributed Control System |
FBC Boiler Automation |
Running since April 1996 |
16 |
West Coast Paper Mills Limited, Dandeli |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 400 R Redundant PLC based SCADA System |
Stock Preparation Plant Automation |
Running since August 2004 |
17 |
West Coast Paper Mills Limited, Dandeli |
---------- |
Design, Detailed Engineering, Supply of Siemens S7 300 PLC based SCADA System |
Disc Filter I & II Automation |
Running since December 2005 |
18 |
JK Paper Mills Limited, Orissa |
---------- |
Design, Detailed Engineering, supply of Siemens S5 series PLC System |
Stock Preparation plant Automation |
Running since August 2004 |
19 |
JK Paper Mills Limited, Orissa |
---------- |
Design, Detailed Engineering, supply of Siemens S5 series PLC System |
Color Kitchen Automation |
Running since February 2005 |
20 |
JK Paper Mills Limited, Orissa |
---------- |
Design, Detailed Engineering, supply of Siemens S7 400 PLC System |
Super Calendar Automation |
Running since November 2004 |
21 |
JK Paper Mills Limited, Orissa |
---------- |
Design, Detailed Engineering, supply of Siemens S7 400 PLC System |
Autosplice Machine Automation |
Under Execution |
22 |
JK Paper Mills Limited, Orissa |
---------- |
Design, Detailed Engineering, supply of Siemens S5 series PLc System |
Coating Machine and Pre-Reeler Machine Automation |
Running since November 2004 |
23 |
JK Paper Mills Limited, Orissa |
---------- |
Design, Detailed Engineering, supply of Siemens S5 series PLC System |
Rewinder Machine Automation |
Running since November 2004 |